Wednesday, April 9, 2008

Day 26

Big, busy day, today. Most of the ceiling is now in place. The gaping holes will be for lights, and the edge pieces (where the ceiling tiles have to be cut into non-square shapes) still have to be done, but the addition of "most of a ceiling" is great progress.

Tuesday, April 8, 2008

Day 25

Today was the priming of the new wall (by the new window):


And the addition of greenboard to the shower ceiling area:

Monday, April 7, 2008

Day 24

A few random things. Such as a small wall portion at the bottom of the steps to serve as a place to attach the drop ceiling:


And the framing in of the ceiling above the shower:

Friday, April 4, 2008

Day 23

The hint of the beginning of the drop ceiling (see the rail-thing near the top of the wall?):

Tuesday, April 1, 2008

Day 22

The wall around the window (plus a 9-year-old):

This was followed by several days (4/2 and 4/3) of spackling and sanding, but I'm not counting them, since each "day" was about an hour of work. They're just getting lumped in with this one.